Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
CT Sensor Direction
#1
From what I've read (and based on most other power monitoring systems) it's important to get the direction of the sensor correct. So, should it look like A or B?

Code:
A)
               (  )---- Sense Leads ------
Source >-------(--)------------------------> Load
               (  )

B)
         ---- Sense Leads ------(  )
Source >------------------------(--)-------> Load
                                (  )

Thanks!
Reply
#2
can you use a photo to show that?
Reply
#3
I did eventually see the arrow on the product diagram.

The wires from the sensors should be placed in the direction of the load. "Leads to loads", or in the above, option A
Reply
#4
ok
Reply


Forum Jump:


Users browsing this thread:
1 Guest(s)